At your service in Spokane
Remodeling Older Homes Spokane
- Itemized, no-surprise pricing
- Local crews, local know-how
- Free no-obligation quotes
Spokane's older homes—the Craftsman bungalows, the American Foursquares, the postwar ramblers built long before today's energy codes—have a lot going for them: solid old-growth framing lumber, real plaster walls, mature landscaping, and a location on a street that was platted before subdivisions had names like "The Reserve." What they don't have is modern wiring, insulation that meets today's climate demands, or floor plans built for how people actually live now. Remodeling one well means understanding both what makes it worth saving and what will fight you every step of the way.
This page is a practical guide to remodeling an older Spokane home—what the work actually involves, how permitting works when a structure predates current code, what our climate does to a renovation plan, and what it really costs. We price every project with itemized, line-item estimates instead of vague lump sums, because "trust us" isn't a number you can hold a budget to. If you want the short version: we remodel kitchens, bathrooms, basements, and whole houses in Spokane's older neighborhoods, we build additions and ADUs on lots that were never designed for them, and we tell you the price before we start, not after.
Why Remodeling an Older Spokane Home Is a Different Job
A contractor who only works on new-build tract housing and a contractor who specializes in Spokane's historic housing stock are not doing the same job, even when the line item says "kitchen remodel" on both bids. Older homes bring a specific set of variables that don't show up in a newer house:
- Balloon framing and true dimensional lumber. Many pre-1950s Spokane homes were framed with continuous studs running from foundation to roofline, which changes how you run new wiring, plumbing, and HVAC chases without opening entire wall cavities.
- Plaster-and-lath walls instead of drywall, which crack differently, patch differently, and often hide horsehair-reinforced plaster that's worth preserving rather than demolishing.
- Knob-and-tube or early cloth-wrapped wiring that may still be live in wall cavities and needs to be identified and addressed before insulation or drywall goes back up.
- Galvanized or early copper plumbing with decades of mineral buildup, reduced flow, and a higher chance of surprises once a wall opens.
- Fieldstone, brick, or shallow poured foundations that were never engineered for a walkout basement conversion or a second-story addition without reinforcement.
- Single-pane windows and minimal or absent wall insulation, which matters enormously once you're paying to heat and cool the space through Spokane's temperature swings.
None of this means an older home is a bad remodeling candidate—quite the opposite. Full-dimension framing lumber and real plaster are often better materials than what's used in new construction today. But a remodel plan that doesn't account for these realities up front tends to blow past its budget the moment a wall opens. We build that assumption into every estimate for a project in an older South Hill home or anywhere else in the city's established neighborhoods, rather than treating it as a change order surprise.
What a Remodel of an Older Spokane Home Covers
"Remodeling an older home" isn't one service—it's a category that touches nearly every room and, often, the structure itself. Here's what that actually looks like project by project.
Kitchen Remodeling
Kitchens in older Spokane homes were usually built for a different era of cooking and a much smaller appliance footprint. A kitchen remodel in one of these homes typically means reworking the layout to open sightlines to a dining or living space (often by evaluating whether a wall is load-bearing, which is far more common in older framing), replacing plaster or old cabinetry, upgrading electrical service to handle modern appliance loads, and addressing any galvanized supply lines before new fixtures go in. We also see a lot of original hardwood subfloor under old vinyl or linoleum, which is frequently salvageable and a nice selling point to preserve rather than cover again.
Bathroom Remodeling
Older bathrooms tend to be small, single-fixture rooms with cast iron tubs, and floors framed for a much lighter fixture than a modern soaking tub or curbless shower. A bathroom remodel here usually involves verifying floor joist capacity, replacing old drain and supply lines while the floor is already open, and dealing with moisture-damaged subfloor that's common in homes with decades of humidity exposure and no bath fan ever installed. Waterproofing and ventilation get more attention in an older Spokane bathroom than in new construction, precisely because the original build often had neither.
Basement Remodeling
Basements in Spokane's older housing stock are usually unfinished or partially finished, with low ceiling heights, fieldstone or block foundations, and no vapor barrier. Finishing one into usable living space means addressing moisture management first—Spokane's freeze-thaw cycles and spring snowmelt put real pressure on older foundation walls—then working around ductwork, sump locations, and ceiling height before framing anything. We cover the full process, including how we evaluate a foundation before framing begins, on our basement remodeling page for Spokane homes.
Home Additions
Adding square footage to an older home means tying new foundation and framing into a structure that was never designed with an addition in mind. That includes matching rooflines, transitioning old wiring and plumbing systems into new code-compliant ones at the connection point, and—critically—getting the structural tie-in engineered correctly so the seam between old and new doesn't become a long-term problem with settling or drafts.
Custom Home Building
Sometimes the right answer for a lot with an older, structurally compromised home is a new custom build rather than a renovation. We also take on ground-up custom home projects in Spokane, applying the same itemized pricing approach and local permitting knowledge to new construction on infill lots or larger parcels around the region.
Decks
Older homes frequently have decks that were added decades after the original build, often undersized, under-flashed, or attached with hardware that no longer meets current structural or ledger-attachment code. A deck project ranges from a straightforward rebuild to a full redesign that accounts for Spokane's snow load requirements and the freeze-thaw stress on footings.
ADUs (Accessory Dwelling Units)
Spokane has increasingly favorable zoning for accessory dwelling units, and older lots—especially those with detached garages or larger backyards common in pre-war neighborhoods—are often good ADU candidates. Building one on a property with an older primary residence means coordinating a separate utility tie-in, verifying setback and lot coverage rules against the existing structure's footprint, and going through a distinct permitting track from a standard remodel.
Garage Construction
Many older Spokane homes have small, single-car, or detached garages that no longer fit modern vehicles or storage needs. Garage construction and replacement projects involve their own foundation, framing, and often electrical scope, and can also be a stepping stone toward a future ADU conversion if that's part of a longer-term plan for the property.
Commercial Remodeling
We also take on commercial remodeling work, including older commercial buildings in the Spokane area that carry many of the same structural and systems-age considerations as older residential properties—outdated electrical service, aging plumbing, and code compliance gaps that need to be addressed as part of the scope.
Permitting Older Homes in Spokane
Permitting is where a lot of older-home remodels either stay on schedule or stall for months, and it's a different process than permitting a new build. When a structure predates current building code, any work you do that touches structural, electrical, plumbing, or mechanical systems typically has to bring that portion of the home up to current code, even if the rest of the house is grandfathered in. That's a normal and expected part of remodeling an older property—it's not a sign something went wrong with your project—but it does need to be planned for rather than discovered mid-job.
A few things that specifically affect permitting timelines and scope on an older Spokane home:
- Unpermitted prior work. Older homes often have additions, finished basements, or electrical changes done without permits by a previous owner. When we open a wall and find that, it can trigger a requirement to bring that earlier work up to current code as part of the new permit, which affects both scope and timeline.
- Structural changes require engineering review. Removing a wall, adding a dormer, or cutting a new foundation opening for a basement egress window all typically require stamped plans before a permit is issued, which takes longer than a cosmetic remodel that doesn't touch structure.
- Electrical service upgrades. If your remodel adds significant new electrical load—a kitchen with modern appliances, an ADU, a garage with heated shop space—the home's existing electrical panel and service size often need to be evaluated and potentially upgraded as part of the permit.
- Multiple inspection stages. Older-home remodels usually require separate inspections for framing, electrical, plumbing, and final occupancy, and each has to be scheduled and pass before the next phase of work proceeds.
We handle the permit applications, coordinate inspections, and build realistic permitting time into the project schedule up front rather than treating it as an afterthought once demolition has already started. For a full breakdown of how permitting fits into the overall project sequence, see our step-by-step remodeling process for Spokane homeowners.
Climate Considerations for Remodeling in Spokane
Spokane's climate is a genuine design constraint, not a footnote. Cold, snowy winters followed by hot, dry summers put real stress on a house, and an older home that was built with minimal insulation and single-pane glazing feels every bit of that swing. A few climate-driven factors that shape how we plan a remodel here:
- Freeze-thaw cycling. Repeated freezing and thawing through the winter puts pressure on older foundations, exterior masonry, and any exterior concrete work—decks, walkways, garage slabs—so footings and drainage need to be planned for frost depth, not just for the summer build season.
- Snow load on rooflines and additions. Any addition, deck cover, or new roof structure has to be engineered for regional snow load, which matters more when you're tying a new roof section into an older, sometimes under-built original structure.
- Ice damming. Older homes with minimal attic insulation and ventilation are prone to ice dams that back water up under roofing and into wall cavities. Insulation and ventilation upgrades during a remodel are often the fix, and we flag this during kitchen, bathroom, and addition projects where the roofline is affected.
- Summer heat and dry conditions. Spokane summers run hot and dry, and older homes without adequate insulation or updated HVAC struggle to keep upper floors comfortable. A remodel is often the right time to address insulation, window upgrades, or ductwork before finishing walls back up.
- Moisture management in basements. Spring snowmelt and seasonal groundwater movement affect older foundations differently than newer poured walls, which is a major factor in how we approach basement waterproofing before any framing goes in.
Building climate performance into the plan during the remodel—rather than treating insulation and moisture control as optional upgrades—is usually far cheaper than fixing ice dam damage or a wet basement after the fact.
Our Process and Timeline
Every project follows the same structured sequence, regardless of size, so you know what to expect and when:
- Initial consultation and site assessment. We walk the property, evaluate the existing structure, systems, and any age-related conditions specific to the home, and talk through your goals and budget range.
- Itemized proposal. You receive a line-item estimate broken out by scope—demolition, structural, electrical, plumbing, finishes—rather than one lump number, so you can see exactly what's driving the cost and where there's flexibility.
- Design and permitting. We finalize plans, pull the necessary permits, and schedule any required engineering review before demolition starts.
- Construction. Work proceeds in phases with scheduled inspections at each required stage, and we communicate proactively if something behind a wall changes the scope.
- Final walkthrough and close-out. Final inspections are completed, punch-list items are addressed, and the labor warranty coverage begins.
Timelines vary significantly by project type and by what permitting and inspection stages are required—a bathroom remodel moves much faster than a home addition with structural engineering and multiple inspection phases. We give you a project-specific timeline as part of the proposal, not a generic range, because an older home with unpermitted prior work or structural surprises genuinely does take longer than a straightforward cosmetic update. The full sequence, including how we handle permitting delays and inspection scheduling, is laid out on our remodeling process page.
What Affects the Cost of Remodeling an Older Home
We price by itemized scope rather than a flat cost-per-square-foot number, because square footage alone doesn't capture what actually drives cost in an older home. That said, cost per square foot is a useful starting reference point once you understand what moves it up or down. The biggest cost drivers we see on older Spokane remodels:
- Condition of what's behind the walls. Outdated wiring, galvanized plumbing, and undersized electrical service are common in older homes and often need to be addressed as part of the project, not as an optional add-on.
- Structural scope. Removing a load-bearing wall, adding an egress window to a basement, or tying a new addition into an old foundation all require engineering and add cost beyond finish-level work.
- Permitting and code-compliance requirements. Bringing older, previously unpermitted, or outdated systems up to current code as part of the remodel is a real cost factor that a newer home simply doesn't have.
- Unpermitted prior work. If a previous owner's DIY work needs to be corrected once a wall or ceiling opens, that's additional scope discovered mid-project rather than something visible during the initial estimate.
- Material and fixture selections. Cabinetry, countertops, flooring, and fixture tiers move the budget significantly and are usually the area where homeowners have the most flexibility to adjust cost.
- Access and site conditions. Older homes with narrow lots, mature landscaping, or limited driveway access can add cost for material staging and equipment access compared to a newer subdivision lot.
Because so much of an older-home budget depends on what's found once the project starts, we build contingency planning into the itemized proposal up front and explain clearly what would trigger a change order, rather than surprising you with one.
Warranty: A Lifetime Labor Guarantee
We back our workmanship with a lifetime labor guarantee. If an issue develops with work we performed, we stand behind the labor that went into it rather than leaving you to chase down a fix on your own years later. On an older home in particular—where a remodel is interacting with decades-old systems and structure—that long-term accountability matters more than it does on a brand-new build, because it's the assurance that we're not just solving today's problem and walking away from tomorrow's.
Licensing and Insurance
Any contractor working on your home's structure, electrical, or plumbing systems should be able to show you current Washington State contractor licensing and active general liability insurance before work begins—and you should ask, every time. This matters even more on an older home, where structural surprises and code-compliance work are common and where uninsured labor puts you personally at risk if something goes wrong mid-project. We detail our credentials and what to verify on our licensing and insurance page, and we're glad to provide documentation before any contract is signed.
Why Work With a Local Spokane Remodeler
A remodeler based outside the region can build a beautiful kitchen, but they won't necessarily know that a South Hill foundation from the 1920s behaves differently than a Spokane Valley slab-on-grade home from the 1970s, or that a Deer Park or Nine Mile Falls property on a well and septic system needs different planning around a basement or addition than a home on city utilities. Local, hands-on experience with the specific building eras and conditions found across the Spokane area is what keeps a project's budget and timeline realistic instead of aspirational.
It also means faster response on permitting questions, inspection scheduling, and material sourcing, since we're not coordinating from across the state. When something behind a wall doesn't match the original plan—which happens often in older homes—being local means we can be on site the same day to assess it rather than leaving you waiting on a remote project manager.
Service Areas
We remodel older homes throughout the Spokane area, including:
- Spokane, including established neighborhoods with older housing stock throughout the city
- South Hill, home to some of the region's oldest and most architecturally distinct housing
- Spokane Valley
- Deer Park
- Mead
- Nine Mile Falls
If your property is in or near one of these areas and you're weighing a remodel of an older home, we can walk the property and give you a realistic sense of scope before you commit to a design direction.
Choosing a Remodeler for an Older Home: What to Look For
Not every contractor who does great work on new construction is equipped to handle an older home well. Before hiring anyone for a remodel on a pre-1970s Spokane property, it's worth asking:
- Can they explain, specifically, how they plan to handle outdated wiring, plumbing, or insulation if it's found once a wall opens—not just whether they've "seen it before"?
- Do they provide an itemized estimate that breaks out labor, materials, and scope by category, or just a single lump-sum number?
- Do they proactively bring up permitting requirements and realistic timelines, or downplay how long code-compliance work might take?
- Can they show current licensing and insurance documentation without hesitation?
- Do they offer any labor warranty, and is it specific about what's covered?
- Do they have direct experience with the specific building era of your home—balloon framing, plaster walls, original foundation type—rather than general remodeling experience only?
The most common mistake we see homeowners make is hiring based on the lowest bid without asking what that bid assumes about the home's existing condition. A low estimate that doesn't account for likely electrical, plumbing, or structural issues in an older home isn't actually a lower price—it's a change order waiting to happen once demolition starts.
Get Your Free Quote
Tell us about your project and we'll put together a clear, itemized estimate.
More home remodeling services
Ready to Talk Through Your Remodel?
Get a free, itemized quote with no pressure to commit.